K2 Station
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0006-2-scaled.jpg)
The K2 Station project was completed in 2011 for Sabir Company.
This project involved excavation operations and the implementation of the rectifier, main structure, and ticket office building.
A major challenge we overcame was executing the complex excavation work while maintaining the integrity and safety of the construction site.
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0042-scaled.jpg)
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0013-scaled.jpg)
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0021-scaled.jpg)
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0041-scaled.jpg)
![](https://cova-co.com/wp-content/uploads/2024/04/IMG_0031-scaled.jpg)