Green Hill

The purpose of this project is to restore the environment of the waste disposal site and recover the waste in the Feridokunnar site.

Implementation steps:

● Environmental studies and determining the contaminated area for rehabilitation

● Determining different recovery methods according to the overall project plan along with the installation of equipment and waste separation and transportation and temporary storage of materials resulting from separation

● Using organic waste to make compost used in the structure

● Burning rejected waste for consumption in the structure

● Conducting on-site and laboratory tests in the geotechnical field

Design and implementation of the place of consumption of recovered materials, including preparation of architectural plan, structural design and executive plans.

Starting the implementation of the required structures and the implementation of the green exhibition building